Bathroom project

before and after

A local remodeling company called us to help them prepare a bathroom to be remodeled.  It hadn’t been cleaned in over a decade.  Because much was being demolished, it didn’t have to be in absolutely perfect condition when the cleaning was finished, just good enough for the workman to safely work in the room.

Also, the homeowner’s father had previously painted over the original yellow and green tile (possibly 30 years ago) and that DIY paint job has been peeling badly for some time now.  You can see in the pictures how we tried not to make it any worse, but was difficult as sheets came off in our hands.

Details

December 7, 2019
Cincinnati, OH

SINK AREA BEFORE:

SINK AREA AFTER:

WINDOW BLINDS AND SILL BEFORE:

WINDOW SILL AFTER:

TUB AND SURROUND BEFORE:

TUB AND SURROUND AFTER:

TOILET BEFORE:

TOILET AFTER:

MIRROR BEFORE:

MIRROR AFTER:

FLOOR BEFORE:

FLOOR AFTER: